How do I change the revision of a drawing in Solidworks?

Select one or more files to transition, and set column values as needed. Select the next revision. Select Update Variable for a file to write the New Revision value to the revision variable in the workflow. Click OK to set the revision.

How do I change the revision symbol in SolidWorks?

Do one of the following:

  1. In a drawing with a revision already in the table, click Revision Symbol (Annotation toolbar), or click Insert > Annotations > Revision Symbol.
  2. Right-click in the revision table of the relevant revision row and select Revisions > Add Symbol.

How do I link a revision table in Solidworks?

Setting Options for Revision Tables

  1. Click Tools > Options > Document Properties > Tables > Revision.
  2. Set the options and click OK. In drawings with multiple sheets, you can set options to activate a revision table on the first sheet only, link the tables on all sheets, or keep the tables independent of each other.

Where do you put document revision history?

Preferred Location for Revision History Section in Documents

  1. Rev History on page 1, with body of document beginning immediately after it. Votes: 1 3.1%
  2. Rev History on page 1, followed by a page break before the body of document begins. …
  3. Rev History on last page. …
  4. No Rev History in the document. …
  5. Rev History, No preference.
IT IS INTERESTING:  Why do we need it architecture?

What is the revision symbol?

The revision symbol uses the revision table’s settings for the shape and revision number or letter. Click in the graphics area to place the symbol. You can place the symbol anywhere, and you can place multiple instances of the symbol while the Revision Symbol PropertyManager is active.

How do you activate the revision symbol in solidworks?

In Tools > Options > System Options > Drawings , select Enable symbol when adding new revision. When selected, any time you insert a row in a revision table, the Revision Symbol tool opens so you can insert revision symbols in the drawing.

How do you add a revision symbol in solidworks?

Do one of the following:

  1. In a drawing with a revision already in the table, click Revision Symbol (Annotation toolbar), or click Insert > Annotations > Revision Symbol.
  2. Right-click in the revision table of the relevant revision row and select Revisions > Add Symbol.

How do you add a revision table?

Inserting a Revision Table

  1. Click Revision Table. (Table toolbar), or click Insert > Tables > Revision Table.
  2. Set the properties in the Revision Table PropertyManager, then click . You can insert text in empty cells by double-clicking the cells and typing text.

How do you customize a BOM in SolidWorks?

Double-click the BOM, or right-click the BOM and select Edit. While the bill of materials is active, it is displayed with row and column headers. Excel toolbars replace the SOLIDWORKS toolbars. Edit the worksheet as needed, using Excel functions.