Quick Answer: How do you monitor grids in Revit?

How do I monitor changes in Revit?

Monitor Elements in the Current Project

  1. Open a model.
  2. Open a view where you can see the elements to be monitored.
  3. Click Collaborate tab Coordinate panel Copy/Monitor drop-down (Use Current Project).
  4. Click Copy/Monitor tab Tools panel (Monitor).
  5. Select one element.

Which elements can be copied and monitored in Revit?

What Elements Can I Copy or Monitor?

  • Levels.
  • Grids (but not multi-segment grids)
  • Columns (but not slanted columns)
  • Walls.
  • Floors.
  • Openings.
  • MEP fixtures.

How do I use a monitor with Revit?

Copy the elements for monitoring:

  1. Click Copy/Monitor tab Tools panel (Copy).
  2. Select the elements to copy. To select multiple elements, on the Options Bar, select Multiple. Then select the elements in the drawing area, and click Finish on the Options Bar. …
  3. Click Copy/Monitor tab Copy/Monitor panel (Finish).

How do you do a coordination review in Revit?

Click Collaborate tab Coordinate panel Coordination Review drop-down, and then select one of the following options:

  1. Use Current Project: To review warnings for elements that are monitored within the current project.
  2. Select Link: To review warnings for elements that are monitored in a linked model.

Which elements can a scope box can control?

Scope boxes are used to control the extents of elements like grids, levels and reference planes. Each of these elements can be assigned to a specific scope box, limiting the 3D extents to the dashed green line limit.

IT IS INTERESTING:  How do I add a floor plan?

How do I copy a monitor light fixture in Revit?

Click Copy/Monitor tab Tools panel (Coordination Settings). Under Category, select a fixture category. Under Behavior, for Copy behavior, select a value.

  1. Click Copy/Monitor tab Tools panel (Copy).
  2. Select the fixtures to copy. …
  3. Click Copy/Monitor tab Copy/Monitor panel (Finish).

How do I stop a screen copy in Revit?

Click Multi-Select tab or Modify | tab Monitor panel (Stop Monitoring).

How do you copy a linked element in Revit?

Copy Elements from a Linked Model

  1. In the drawing area of a view of the host model, move the cursor over the element in the linked model.
  2. Press Tab until the element to copy is highlighted, and click to select it.
  3. Click Modify | RVT Links tab Clipboard panel (Copy to Clipboard).

How do you copy on a monitor?

Click the window that you want to copy. Press ALT+PRINT SCREEN. Paste (CTRL+V) the image into an Office program or other application.